Circe Energy West Texas AI Infrastructure Campus
AI dedicatedOperated by Circe Energy · TX, US1 srcupdated 5d ago
1,950-acre AI/HPC campus in the Permian Basin run as a behind-the-meter prime-power microgrid, with about 2GW of Cummins gas gensets ordered for delivery 2026-2030 and phased energisation from 2027. The exact site has never been disclosed publicly, so the coordinates are a regional placeholder at Midland, Texas and should not be read as a site location; the record describes a development platform rather than a built data center, and the 2GW figure is generation capacity rather than committed IT load.
Compared to peers
Compared with 166 peer facilities in US.
- Capacity (MW)
- 0below median
- median 34 · p95 1,800
- Supplier coverage
- 0no peers
- median 0 · p75 0
- Announce → online lag
- in progress
- no completions yet
Bands describe deviation from peer median; not a judgment.
Ownership chain (Circe Energy)
No ownership chain tracked yet for this entity. Investigators can add parent companies via the ownership_edge table or community findings.
Public subsidies & incentives
No subsidies, tax abatements, or public incentives recorded for this facility yet.
Permits
No permits tracked for this facility yet. Public records (county permits, environmental filings, grid interconnect filings) can be sourced via community findings.
Timeline
- Announced
- —
- Groundbreak
- —
- Online
- —
- Full capacity
- —
Power
- Primary source
- gas
- Utility
- —
- PUE pledged
- —
Suppliers (0)
No suppliers tracked yet. Sign in to contribute.
Sources (1)
Community findings (0)
No findings submitted yet. Sign in to dispute or correct facts.